Updates » Work plan…

Work plan...

The work plan we have arranged with Moises is: (a) herbicide to 4 hectares of 2007 plantings to control the grasses, (b) herbicide to the 10 ha of 2010 following the lines of the trees, (c) finish the fertilization of 2010, (d) install the donor signs, (e) install the benches in the Triumvirate Forest 2007, (f) plant 10 tree seedlings (Vochysia ferruginea) in lot 1 of 2010, and (g) spray the cedar and mahogany of 2007. This represents another 3 weeks of work until we can pass to clean and thin the Connecticut College and CMEEC forests.

The work plan we have arranged with Moises is: (a) herbicide to 4 hectares of 2007 plantings to control the grasses, (b) herbicide to the 10 ha of 2010 following the lines of the trees, (c) finish the fertilization of 2010, (d) install the donor signs, (e) install the benches in the Triumvirate Forest 2007, (f) plant 10 tree seedlings (Vochysia ferruginea) in lot 1 of 2010, and (g) spray the cedar and mahogany of 2007. This represents another 3 weeks of work until we can pass to clean and thin the Connecticut College and CMEEC forests.

Leave a Reply

Please log in using one of these methods to post your comment:

Gravatar
WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.